Finished sites & works in progress

A dig looks like mud until you see the levels. Every project below shipped with written volumes and verifiable grades — captions show the field numbers.

Hillside terracing — Ubud side — Three building pads cut into a jungle slope, balanced on site.
Hillside terracing — Ubud side Three building pads cut into a jungle slope, balanced on site. CUT 320 M³ · FILL 280 M³ · 6 DAYS
Pool pit — Pererenan — 8×4 m pit with overdig, walls held clean through a rain week.
Pool pit — Pererenan 8×4 m pit with overdig, walls held clean through a rain week. 52 M³ · 2 DAYS · MINI + HAND FINISH
Limestone pool & footings — Uluwatu — Breaker on solid coral limestone, priced after free test dig.
Limestone pool & footings — Uluwatu Breaker on solid coral limestone, priced after free test dig. 74 M³ ROCK · 8 DAYS · PC200 + BREAKER
Cut & fill grading — Kedungu — Coastal plot leveled to design levels, zero trucks in or out.
Cut & fill grading — Kedungu Coastal plot leveled to design levels, zero trucks in or out. 1,100 M³ MOVED · BALANCED ON SITE
Batu kali retaining wall — Pererenan gorge — 38 m wall with weep holes and gravel backdrain, then backfill.
Batu kali retaining wall — Pererenan gorge 38 m wall with weep holes and gravel backdrain, then backfill. H 3.2 M · 118 M³ STONE
Jungle clearing — Seseh — 12 are of heavy vegetation out, topsoil saved for the garden.
Jungle clearing — Seseh 12 are of heavy vegetation out, topsoil saved for the garden. 12 ARE · 4 DAYS · TOPSOIL STOCKPILED
French drains — Sanur villa — Perimeter drainage into a soakaway; December water gone.
French drains — Sanur villa Perimeter drainage into a soakaway; December water gone. 64 M DRAIN · 2 SOAKAWAYS
Access road over paddies — Seseh — Geotextile and compacted sirtu; concrete trucks in all season.
Access road over paddies — Seseh Geotextile and compacted sirtu; concrete trucks in all season. 140 M ROAD · 7 TRUCK PASSES DAILY
Strip foundations — Canggu — Footings dug and hand-trimmed in paddy clay, dewatered.
Strip foundations — Canggu Footings dug and hand-trimmed in paddy clay, dewatered. 96 M³ · HIGH WATER TABLE
River-valley terraces — Ubud — Switchback access built first, then stepped pads down the slope.
River-valley terraces — Ubud Switchback access built first, then stepped pads down the slope. ACCESS + 3 PADS · 9 DAYS
Estate plot strip & grade — Uluwatu — Thin soil off, limestone leveled for a two-villa estate.
Estate plot strip & grade — Uluwatu Thin soil off, limestone leveled for a two-villa estate. 2,400 M² STRIPPED · LASER-GRADED
Handover — levels verified — Grade stakes stay in place so the architect checks every pad.
Handover — levels verified Grade stakes stay in place so the architect checks every pad. TOLERANCE ±30 MM ACHIEVED

Want the numbers behind jobs like these? See 2026 prices or the worked cost examples. Your plot is different — every plot is — so send a pin and we’ll price yours properly.

Get a free site visit and a volume-based quote

Send us your location pin and a few photos of the land on WhatsApp. We visit the site, measure levels, calculate real volumes and send an itemised quote — usually within 24 hours. No obligation.

FREE SITE VISIT · QUOTE IN 24H · OWN MACHINES