Excavation & earthworks prices in Bali

2026 numbers, in IDR, the same ones we put in quotes. Prices are “from” because soil, access and haul distance genuinely change cost — the exact figure is fixed in writing after a free site visit, and doesn’t move after that.

UPDATED JULY 2026 · ALL PRICES IDR · +LOCAL TAX WHERE APPLICABLE

Machines & day rates (operator + fuel included)

WorkUnitPrice (IDR)
Mini excavator (PC50–75, fits 1.8 m gate)dayfrom 3,400,000
20-ton excavator (PC200 class)dayfrom 5,400,000
20-ton excavator + hydraulic breakerdayfrom 7,600,000
Vibro roller (compaction)dayfrom 3,400,000
Dump truck with driver (local hauls)dayfrom 1,900,000
Dewatering pump with hosesdayfrom 450,000

Excavation

WorkUnitPrice (IDR)
Machine excavation, normal soilfrom 95,000
Hand digging (tight access, precision)from 300,000
Limestone / rock breaking (Bukit)380,000–550,000
Swimming pool pit, soil (typ. 8×4 m)packagefrom 8,500,000
Basement dig-out (shoring priced separately)from 120,000

Grading, fill & compaction

WorkUnitPrice (IDR)
Cut and fill, moved on sitefrom 85,000
Imported fill soil, delivered7 m³ truckfrom 660,000
Compaction in 20–30 cm layersm² / layerfrom 22,000
Final grading of building padfrom 18,000

Land clearing

WorkUnitPrice (IDR)
Light vegetation & grassare (100 m²)from 550,000
Heavy jungle incl. removalarefrom 2,200,000
Large tree felling & removaltreefrom 1,500,000
Root grubbing after clearingarefrom 300,000

Trucking & disposal

WorkUnitPrice (IDR)
Soil haul-away within 10 km7 m³ truckfrom 480,000
Extra distance beyond 10 kmkm+30,000
Concrete / demolition debris7 m³ truckfrom 620,000

Retaining walls & drainage

WorkUnitPrice (IDR)
Batu kali stone retaining wall, builtfrom 1,550,000
Gabion wall incl. stone & meshfrom 1,150,000
French drain (gravel + perforated pipe)mfrom 450,000
Concrete U-ditch 30 cm, installedmfrom 380,000
Soakaway pit, built & coveredunitfrom 3,800,000

Trenching & septic

WorkUnitPrice (IDR)
Machine trench, 60 cm deepmfrom 90,000
Hand trench (near walls, tight sites)mfrom 140,000
Septic tank standard 2-chamber + soakawaypackagefrom 9,500,000
Bio septic, supplied & installedpackagefrom 16,000,000

Access roads & hardstanding

WorkUnitPrice (IDR)
Temporary site road (geotextile + sirtu)from 240,000
Permanent gravel driveway, compactedfrom 320,000
Concrete hardstanding / apronfrom 480,000
Mobilization, south Bali (flatbed both ways)job1,500,000–2,500,000

What actually moves the price

  • Access width. A 20-ton machine digs a pool pit in a day; if only a mini fits through your Canggu gang, the same pit takes three. Access is the first thing we check on the visit.
  • Soil vs rock. The border between “soil price” and “limestone price” runs right through the Bukit. A free test dig settles it before you sign — never after.
  • Haul distance. Trucks are priced per trip. A plot 4 km from a fill site and one 25 km away are different budgets; we state truck counts and distance in the quote.
  • Season. Wet-season clay work needs pumps and patience. Some jobs we honestly advise moving a few weeks — see the rainy season guide.
  • Volume. Mobilization is a fixed cost, so per-m³ price drops as volume grows. Combining works (dig + wall + drainage) in one mobilization is the cheapest way to buy earthworks.

Worked examples with full budgets are in the excavation cost guide and building on a slope.

FAQ

Pricing — frequently asked questions

Why do you quote per m³ instead of per day?

Day rates reward slow work. Per-m³ pricing means you pay for result, not hours — and we can only price per m³ because we measure your land and calculate volumes first. Machines are still listed per day above for jobs where that honestly fits better (small mixed scopes).

Is the site visit and quote really free?

Yes — free visit, measured levels, itemised quote within 24 hours, anywhere on our areas list. If rock is suspected we do a free test dig too. You can use our quote to compare other contractors; owners do it all the time.

Do prices include trucks and soil disposal?

The quote always itemises them: haul-away per truck, imported fill per truck, distance surcharges. Nothing appears mid-project. If cut and fill can be balanced on your site, we say so — it routinely removes 30–60 trucks from a budget. See how cut and fill works →

How is payment structured?

Typical structure: 30% mobilization, 40% at mid-progress checkpoints you can verify against grade stakes, 30% on handover of finished levels. For small jobs (under ~15 million IDR) it is usually 50/50. Always in writing, always tied to measurable progress.

Get a free site visit and a volume-based quote

Send us your location pin and a few photos of the land on WhatsApp. We visit the site, measure levels, calculate real volumes and send an itemised quote — usually within 24 hours. No obligation.

FREE SITE VISIT · QUOTE IN 24H · OWN MACHINES