River gorges · sloped plots · retaining walls

Excavation & Earthworks in Pererenan

Pererenan builds on the edge — literally. River gorges, terraced drops and boulder ground make this the most three-dimensional earthworks in the Canggu belt: excavation, retaining walls and drainage designed as one system, by one crew, in one quote.

FREE SITE VISIT IN PERERENAN · OWN MACHINES & OPERATORS

Excavator shaping a river gorge plot for a new villa in Pererenan Bali

The gorge is the price and the prize

Pererenan’s best plots trade flat convenience for river views — and hand their owners a vertical problem. Our work here is rarely “dig a hole”: it’s cutting terraces into a slope that drops toward the Yeh Poh or a side gorge, holding those terraces with batu kali or gabion walls, and routing water so February doesn’t reclaim the engineering. The reward for doing it properly is the villa every guest photographs from the pool edge.

Under the topsoil, Pererenan hides river-boulder conglomerate — rounded stones the old rivers left behind. Some days the bucket slides through clay; some days it rings on a boulder the size of a sofa. We test-pit before quoting, price boulder ground in its own band, and turn the better stones into wall face and road base instead of paying to truck them away. Spoil that can’t be reused leaves through routes agreed with the banjar — the lanes here are as tight as Canggu’s, with more elevation drama.

Recent Pererenan work: a 38 m gorge-side wall with full backdrain, three stepped villa pads balanced on site (zero trucks either way), and a pool pit ten meters from the gorge lip — dug, dewatered and handed to the shotcrete crew in four days. If your plot is in the lanes toward Seseh or up toward the highway, we’re passing daily; site visits usually land within 24 hours.

FAQ

Earthworks in Pererenan — FAQ

My Pererenan plot drops toward the river. Can it still be built on?

Almost certainly — gorge-edge plots are Pererenan’s signature, and terracing is how they become buildable. Expect a stepped cut, one or more retaining walls and serious drainage. We quote the earthworks and walls together, because on this terrain they are one system.

What is the ground like in Pererenan?

A mix that keeps operators humble: paddy clay on the flats, then river-boulder conglomerate near the gorges — pockets of rounded stones from fist-size to furniture-size. Boulders slow digging and change disposal, so our quotes here follow a test pit, not a guess from the road.

How much does a retaining wall cost in Pererenan?

Batu kali walls from IDR 1.55 million/m³ built, gabion from 1.15 million — a typical 3 m gorge-side wall runs 4–6 million per running meter including footings and drainage. Real numbers per height are in the slope guide.

Do you coordinate with architects on terraced designs?

Weekly. Pererenan attracts ambitious architecture, and we’re used to working from sections and level plans, setting out terraces with a laser and handing over pads the architect can verify stake by stake. Send the drawings with your pin and the quote will speak their language.

Get a free quote in Pererenan

Send your location pin and photos of the land on WhatsApp — we work in Pererenan regularly and can usually visit within a day or two.

FREE SITE VISIT · QUOTE IN 24H · OWN MACHINES